The works to be executed under this contract involve:
- ground treatment and site formation works of about 75 hectares within the Lok Ma
Chau Loop (the Loop);
- construction of about 3,000-metre-long carriageway and associated footpaths and
cycle tracks, and a public transport interchange, within the Loop;
- construction of Western Connection Road Phase 1 through widening of the
existing Ha Wan Tsuen East Road of about 800m long; associated ground
treatment and site formation works; construction of footpath, cycle track, slopes
and retaining walls; and construction of a bridge about 60m long over the old
Shenzhen River meander;
- provision of other infrastructure, including a tertiary sewage treatment works and
sewerage system, a water supply system and a drainage system, and other
associated works; and
- environmental mitigation measures including compensation for offsite wetland of
about 18 ha and offsite woodland of about 1.3 ha.