# [合约编号TK/2009/01 - 将军澳市中心南及调景岭基础设施工程](https://www.chunwo.com/zh-cn/what-we-construct/contract-no.-tk/2009/01-infrastructure-works-at-town-centre-south-and-tiu-keng-leng-tseung-kwan-o)

 作者：[管理员](https://www.chunwo.com/zh-cn/what-we-construct/author/管理员) | Jun 21, 2022 4:21:47 AM

工程项目主要包括拆除现有预压墨汁物料，修复现有海堤并将其提高至原设计水平，建造排水管、排污馆、水管及道路系统

[查看完整帖子](https://www.chunwo.com/zh-cn/what-we-construct/contract-no.-tk/2009/01-infrastructure-works-at-town-centre-south-and-tiu-keng-leng-tseung-kwan-o)

```json
{
  "@context" : "http://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "管理员"
  },
  "dateModified" : "2022-06-21T04:21:47.841Z",
  "datePublished" : "2022-06-21T04:21:47Z",
  "headline" : "合约编号TK/2009/01 - 将军澳市中心南及调景岭基础设施工程",
  "image" : {
    "@type" : "ImageObject",
    "height" : 600,
    "url" : "https://8729158.fs1.hubspotusercontent-na1.net/hubfs/8729158/image-Oct-04-2021-06-23-50-80-AM.jpeg",
    "width" : 600
  },
  "mainEntityOfPage" : "https://www.chunwo.com/zh-cn/what-we-construct/contract-no.-tk/2009/01-infrastructure-works-at-town-centre-south-and-tiu-keng-leng-tseung-kwan-o",
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "height" : 60,
      "url" : "/hs/hsstatic/content_shared_assets/static-1.4092/img/default-amp-logo.png",
      "width" : 60
    },
    "name" : "What We Construct"
  }
}
```