The works mainly comprise uprating the combined raw water transfer capacity of
the existing Pui O raw water pumping station and Pui O No.2 raw water pumping
station, and laying approximately 1.2 kilometres of water mains with diameter
ranging from 1200 mm to 1400 mm along South Lantau Road.