Contract No. 18/WSD/21 Uprating of Pui O Raw Water Pumping Station and Pui O No. 2 Raw Water Pumping Station and Laying of Raw Water Mains along South Lantau Road

Written by 管理員 | Jul 24, 2023 4:19:57 AM

The works mainly comprise uprating the combined raw water transfer capacity of 
the existing Pui O raw water pumping station and Pui O No.2 raw water pumping 
station, and laying approximately 1.2 kilometres of water mains with diameter 
ranging from 1200 mm to 1400 mm along South Lantau Road.