MTR Contract No. 1119 — Shatin to Central Link: Trackwork and Overhead Line Modification Works at Lo Wu and Pat Heung Depot

Written by Admin | Jun 7, 2022 9:22:02 AM

The Works include the design, manufacture, supply, delivery, installation, testing, commissioning and integrated tests for the Trackwork, Overhead Line System, Drainage and Ancillary Works in accordance with the requirements of the Contract Tracksworks comprise construction, supply, delivery, installation, testing and commissioning of the approximately 7.0 km of new track at the existing Pat Heung Depot.