Express Rail Link - Contract 803C West Kowloon Terminus Piles (Site A - South)

Written by Admin | Jun 8, 2022 7:28:04 AM

Key FeaturesA) Carry out 166 nos. pre-drilling holes;B) Construction of 65 nos. of large diameter bored piles where 45 nos. with steel stanchion embedded;C) Construction of 727 nos. of socket H-piles;D) Demolition of existing of toilet structure, PTI ground slab and portion of box culvert.