What We Construct

Bored Piling and Precast Prestressed Concrete Piling Contract at Area 3 for MGM  Cotai Project, MGM Grand Paradise, Macau

Written by Admin | Jun 8, 2022 7:22:12 AM

Construction of 47 Nos. of 3000mm diameter bored piles, 135 Nos. of Precast Pre-stressed concrete piles and assoicated testings