Express Rail Link - Contract 803C West Kowloon Terminus Piles (Site A - South)
Client
MTR Corporation Limited
Construction Period
Feb 2010 -
Feb 2011
Key Features
A) Carry out 166 nos. pre-drilling holes;
B) Construction of 65 nos. of large diameter bored piles where 45 nos. with steel stanchion embedded;
C) Construction of 727 nos. of socket H-piles;
D) Demolition of existing of toilet structure, PTI ground slab and portion of box culvert.