Home    >   Construction    >   Civil Engineering    >   Contract No. CV/2012/09 Liantang/Heung Yuen Wai Boundary Control Point Site Formation and Infrastructure Works – Contract 3

Contract No. CV/2012/09 Liantang/Heung Yuen Wai Boundary Control Point Site Formation and Infrastructure Works – Contract 3

The project mainly comprises the construction of an interchange with four viaducts near Kiu Tau, Fanling for the connecting road to the Boundary Control Point, widening of portion of the existing Fanling Highway of about 1 km long near the interchange, demolition of the existing Kiu Tau Vehicular Bridge, re-provisioning of the existing Kiu Tau Footbridge, realignment of the existing Tai Wo Service Road West and Tai Wo Service Road East, and associated waterworks, slope, drainage, sewerage, and landscaping works.

 

The Works comprise the following items:
(i) construction of four link roads connecting the existing Fanling Highway and the south portal of theLung Shan Tunnel;
(ii) realignment of existing Tai Wo Service Road;
(iii) Widening portion of Fanling Highway;
(iv) construction of associated footpath, slopes, retaining structures, drainage, sewerage, waterworks,landscaping works and other ancillary works;
(v) associated environmental mitigation measures, and Environmental Monitoring and Audit (EM&A)programme for the works.

 

Client
Civil Engineering and Development Department

Contract Value
2,545 million HKD

Construction Period
July 2013 - August 2019