Home    >   Construction    >   Civil Engineering    >   Contract No. 3/WSD/15 In-situ Reprovisioning of Shatin Water Treatment Works (South Works) - Advance works

Contract No. 3/WSD/15 In-situ Reprovisioning of Shatin Water Treatment Works (South Works) - Advance works
The Works under this Contract is in-situ reprovisioning of Sha Tin Water Treatement Works (South Works) - Advance Works which this Contract comprises the advance works that are required to be provided before demolition of existing facilities and the main reprovisioning the works can commence.
 
The key elements of this Contract includes design and construction (comprising foundation, substructure, superstructure, building services works, electrical & mechnical works, power supply system, treatment process, chemical dosing facilities, instrumentation, control, automation system, and performance testing and commissioning of all works) of WTW Logistics Centre and Alum Saturation Tanks; North Works Temporary Power House; Valve Chamber; Hydro Turbine House; and modfiication of South Works Clarifer No. 1 become temporary Washwater Recovery Tanks.  Also, site formation works for WTW Logistics Centre including excavation & bored pile retaining walls and site formation works for the new North Circular Road.  It also consists construction of modification of Main Entrance with drainage works & nullah decking; box culvert at South Gate area; transplant of trees and associated site works, access roads, pipes, ducts, trenches, and other ancillary facilities.

Client
Water Supplies Department

Contract Value
998 million HKD

Construction Period
October 2015 - October 2019